The impact of release times, lot size, and scheduling policy in an A&T facility

Sep 1, 2006·
Q Chen
,
L Xi
,
Y Wang*
· 0 min read
Abstract
A number of recent research works have focused on how to improve the performance of production systems. This paper examines the system based on a simulation model with two manufacturing cells under a re-entrant environment. With the model a set of experiments has been carried out to study how the factors influence the system performance. Different release times and lot sizes have been compared, and scheduling heuristics for both bottleneck and non-bottleneck have been discussed to capture the essence of the production system…
Type
Publication
International Journal of Advanced Manufacturing Technology